Reconstruction of the loading dock in Tuapse

prj-tuapse

Reconstruction of the loading dock with a full equipment replacement and communication_ equipment at the project “Oil receiver technology for the Tuapse Refinery”. An analysis of the geographic, climatic conditions for the Project and simulation of the possible risk factors that could affect on the Project implementation. An analysis of the risks associated with the circumstances of an irresistible force, according to the Projects in the specific geographic and climatic conditions (seismic danger).